BIDS

Turf/Track Bid | Published Wednesday, Jan 25th 2023 (Active Bid)

See link for Turf/Track Bid Here: https://drive.google.com/file/d/1v3MUPSEOTgVE6MeGQBm6haoYGTz54OUn/view?usp=sharing

Return bid via email to Hayden Fusilier,  hfusilier@flcobras.com by Wednesday February  8, 2023 at noon

South Entrance to Football Field Road & Parking Paving Addition. Posted: 5/15/22 (Bid Window Closed)

Fine blade existing base gravel and to apply 3” asphalt (compacted) to the shaded road shown

below (approx. 14,950 square feet). Apply 2” asphalt (compacted) to the remaining area shown

below (approx. 48,700 square feet).

Image of site

Site walk throughs are recommended. For any questions call 501-463-2752 or email hfusilier@flcobras.com

NEW SOUTH ENTRANCE & PARKING (Bid Window Closed)

Download SPECS | Download Construction Plans | Addendum 1

ADVERTISEMENT FOR BIDS

Separate sealed BIDS for the NEW SOUTH ENTRANCE & PARKING will be received by FOUNTAIN LAKE SCHOOL DISTRICT at the FOUNTAIN LAKE ADMINISTRATION BUILDING, 4207 PARK

AVENUE, HOT SPRINGS, ARKANSAS, 71901 until 2:00 p.m. local time, on NOVEMBER 19, 2020 at which time bids received will be opened and read aloud.

The project generally includes the construction of a proposed aggregate surfaced overflow parking lot as well as a mixture of aggregate and asphalt surfaced drives.Items within the project scope include but are not limited to erosion control, clearing, grading, storm sewer, surfacing, and site stabilization.

The CONTRACT DOCUMENTS may be examined at the following locations.

B & F Engineering, Inc.

928 Airport Road

Hot Springs, AR 71913

(501) 767-2366

Beginning November 4, 2020, a complete set of Contract Documents may be purchased from B & F Engineering, Inc. upon payment of $45.00 for each set. Return of documents is not required, and amount paid for documents is not refundable.A PDF version of the Contract Documents may be downloaded at https://www.flcobras.com/o/flsd/page/bids--8.There is no fee for the PDF version.To receive any addenda issued for the project, BIDDERS must complete and return the Acknowledgement as directed and included in the Project Manual

The OWNER reserves the right to reject any or all bids, to waive informalities in the bids received, to evaluate bids, and to accept any bid or bids which, in his opinion, may be in the best interest of the OWNER.

Each BIDDER must deposit with his Bid, security in the form of a Bid Bond or Cashier Check in an amount not less than five percent (5%) of the Bid if the Bid amount exceeds $35,000.No BIDDER may withdraw his Bid within sixty (60) calendar days after the actual date of the opening thereof.

Attention of Bidders is particularly called to the requirements as to conditions of employment including Equal Employment Opportunity to be observed.BIDDERS shall be licensed as required by statutes and the rules and regulations of the Arkansas Contractor’s Licensing Board.

END OF DOCUMENT 00030.

TIMBER BID (Bid Window Closed)

Posted 3/2/2020

Public Notice

The Fountain Lake School District is now receiving bids for timber in area 1 & 2. See map for details. Bids must be delivered to the Fountain Lake School District Administration Building at 4207 Park Avenue, Hot Springs, Arkansas or online at flcobras.com/bids no later than 12:00 P.M. March 16, 2020. All information pertaining to the timber bid can be obtained online at flcobras.com/bids. Bids can be hand delivered, sent through certified mail, or emailed to hfusilier@flcobras.com

Area 1 must be completed first. We will be moving forward with site excavation once timber is removed.

Site visits are welcome between 7am-3pm M-F.

Please call 501-701-1712 before arrival.

Timber Map

AGRI SHOP 3-PHASE BID (Bid Window Closed)

Posted 10/22/19 (Bid Now Closed)

Fountain Lake School District is seeking bids for installation of a new 3-Phase electrical service to the Agri Shop. Installation of new 800-amp, 480 volt, 3-Phase electrical service. This is to be a pad mount transformer approximately 150’ from existing utility pole and 150’ from building.

This is based on Entergy providing and installing the meter at the transformer. No Junction boxes or CT cabinets shall be required.

At this time we are needing service only. Please visit flcobras.com/bids for more information.

Clarifications

  • Call Arkansas One Call prior to any Trenching

  • All Electrical installation to meet or exceed the NEC and local codes

  • Coordination of all work with FLSD

  • Proposal based on work being performed during normal business hours.

  • Any permits, fees, and inspections.

  • Installation of new 800-amp, 480-volt, 3-phase electrical service. This is to be a
    pad mount transformer approximately 150’ from the existing utility pole and
    approximately 150’ from the building.

  • Installation of (2) 4” PVC conduits from the pole to the pad mount transformer
    with pull strings. Entergy is to install and terminate this wire.

  • Installation f (2) 4” conduits and wire from the pad mount transformer to the
    building. Installation and termination of wire in these conduits.

  • This is based on Entergy providing and installing the meter at the transformer.
    No junction boxes or CT cabinets shall be required.

  • Installation of concrete pad for transformer as per Entergy’s specs.

  • Installation of fused disconnect on Agri Building

  • Rework an existing outdoor 20 amp power run from the building to an outdoor network switch box to accommodate the new work. Installation of separate conduits for power.

  • All trenching, backfilling, and compacting for the above mentioned work. Utilize

  • FLSD provided mini-excavator to perform this work. Existing spoils are to be re-used to backfill the trench.